2008年12月22日星期一

The Design of Hotel Video Surveillance System

The system is the use of video technology to detect and monitor the regional security and real-time display and record live images of the electronic system or network. This project at all entrances and exits, the Office of the elevator, the elevator car box set up at places such as surveillance cameras. Power to control use of bus lines, video line for one-on-one. The whole floor, a total of 62 cameras.

(1) security system can be configured for digital recorders and video cameras record data (24 hours a day, one month) in order to record all surveillance activities in the area, and again at any time frame possible. Video disk configuration will be used repeatedly, when the camera detection device to detect anomalies, the video disk recorded under unusual circumstances occurred in the previous section of the 15S will be maintained so that security personnel to track the whole process of the incident.

(2) Center for the host system-wide matrix system, all at the same time video camera. Use of hard disk video recorders. According to the security control room hosts need to achieve full-screen, four screen, the Kowloon-screen, the monitor's display screen includes cameras, address, hours, etc. According to the information needs of some of the security cameras in the control room, such as Yunnan control, focus adjustment, and so on.

(3) the system can switch timing. Switching time adjustable from 1 to 30 seconds, at the same time can manually select a camera to track and video.

(4) CTV with a fixed camera, shaking his head, pitching movement, zoom in and illumination application of the low environmental characteristics, and can be mounted on access to the best picture. Selection of cameras inside the elevator fixed, and other selected places with cloud desktop. Camera ~ 220V power supply, power supply provided by the security control room, equipped with its own camera transformation, rectification and emergency batteries.

(5) selection of video cables SYV - 75 - 5, choose Control Cable RVVP - 2X1. 0, optional power ZRBV - 2X2. 5, the laying of the cable trunking methods used to wear metal, galvanized steel pipe dark enough.

没有评论:

发表评论